installation
flooring

Installation: Prior to installation of solid wood on top of concrete, the concrete is cleaned and scraped to make sure it's level. Then we seal the concrete. 24 hours are required for sealant to dry.  Mastic is applied, then 5/8 or 3/8 CDX plywood is glued and nailed down to create moisture barrier so that buckling is prevented.
Sand and Finish: Wood is sanded and stained (per client's choice of color) then finished with 3 coats of water-based polyurethane.
•  back to SERVICES

OSCAR FLORES
HARDWOOD FLOORS
250 E. Baker St., Suite 101
Costa Mesa, CA 92626
714.549.2180 TEL
714.549.2184 FAX

info@ofhardwoodfloors.com

© 2010  Oscar Flores Hardwood Floors, Inc. All Rights Reserved.  Licensed & Bonded #723812 
Design by Webssites /Laura Quick