Installation: Prior
to installation of solid wood on
top of concrete, the concrete is
cleaned and scraped to make sure
it's level. Then we seal the concrete.
24 hours are required for sealant
to dry. Mastic is applied,
then 5/8 or 3/8 CDX plywood is glued
and nailed down to create moisture
barrier so that buckling is prevented.
Sand and Finish: Wood
is sanded and stained (per client's
choice of color) then finished with
3 coats of water-based polyurethane.
• back
to SERVICES